Stan Palmer Construction: Underground Utilities

What We Do

Underground Utilities

It’s easy to stick a pipe in the ground. But that pipe, when covered with dirt and hidden from view, must hold up for a century. Achieving that result requires advanced technology, like laser projectors that plot elevation lines on distant markers.

Every season, Stan Palmer Construction underground crews lay hundreds of miles of pipe—ranging from one inch to 54 inches in diameter—for water lines, sanitary sewers, and storm sewers. Related structures include intakes, box culverts, and manholes.

Cherry Avenue Basin CSO and Beach Main Improvements
Bremerton, WA
Installation of 400 feet of HDPE sanitary sewer piping (20" and 24" diameter), five each tie ins to existing piping, 500 lf of 16" bypass piping, three line stops, and two pigging stations. All work was performed on a beach located below a steep bluff under tidal conditions while maintaining existing force main and gravity flows with zero spillage tolerance.

Blake Island Sewer Repair
Blake Island State Park, WA
Renovate the existing sewer/septic system including underground sewerlines, tanks, pumps and controls, and complete construction of SSDS LOSS System. All materials and equipment required barging.

SR 304 Transportation Improvements Project; The Missouri Gate Phase
Bremerton, WA
A WSDOT/City project including a 24' high tie back retaining wall with architectural design poured into the concrete, roadway excavation, extensive storm, water and sewer piping, landscaping, illuminaires, signalization, curbs and gutters, walks, and 8" thick asphalt paving.

West 650 Pressure Zone Improvements Transmission & Distribution Main
Bremerton, WA
Installed 16,700 lf of 12" DI watermain through streets and mountainous areas requiring rock blasting for trenching. Also installed fiber optics controls and two pressure reducing stations.

Harbor Ridge Middle School Water Main
Gig Harbor, WA
Provide all work and materials to complete all general and civil work under a single general contract for the construction of a water main extension from 96th Street NW and Burnham Drive NW to Harbor Ridge Middle School for Peninsula School District No. 401.

Alderbrook Water System Reservoir/Source Improvements
Union, WA
Water system improvements for the Alderbrook Water System including the following: 72,000 gallon reservoir, new booster pump building and booster pumps, a standby generator and propane tank, underground water lines and electrical lines at the reservoir site, improvements including new booster pumps at two existing booster stations, a SCADA system, and related work as specified.

Callow Ave Basin Storm Drainage Seperation
Bremerton, WA
Installation of storm drainage pipe ranging in size from 8 inches to 54 inches, installation of manholes and catch basins, work site traffic control, surface restoration, erosion control, relocation of a 6-inch water main, sewer service connections, and catch basin connections.

Belfair Pressure Zone No. 2 Water Storage Tank
Belfair, WA
Excavation and backfill for reservoir ring foundation per T Bailey, Inc. design, underground piping and conduits, fence and grates, rock for drain outlet and electrical controls.

Fort Ward Parade Grounds Phase One
Bainbridge, WA
Single family residential development of 22 lots and 1.68 acre of open space.

Aberdeen Industrial Water Line - Phase 1A & East Aberdeen Pressure Sewer Line - Phase 2
Aberdeen, WA
A 11,100 foot non-potable water line consisting of approximately 8,640 feet of 48 inch diameter HDPE pipe, completed entirely with butt-fused joints, and 2,185 feet of 48 inch diameter ductile iron pipe. The pipeline was constructed directly in or immediately adjacent to wetlands, placing unique construction requirements on the project.

Pine Road Basin CSO Storage Facility
Bremerton, WA
Constructing a new 100,000 gallon concrete basin, a new manhole, and installing new sewer interceptors.

Mission Creek Youth Camp
Belfair, WA
Installing a recirculating sand filter, precast concrete recirculation/mixing tank, filter underdrain pump station, interconnected piping, and related mechanical and electrical work.

Lower Port Orchard Pump Station and Force Main Kitsap Sewer Dist #5
Port Orchard, WA
Installed approximately 1,000 lf of gravity sewer main under wetland by directional drilling, 2,000 lf of sewer force main, constructed a new sewage pump station, and demolished three existing pump stations.

El Dorado Hills & Merrill Place West Stormwater Conveyance
Bremerton, WA
Improved existing storm drainage conveyence facilities within the plats of El Dorado Hills Divisions 2 & 3. Work included: installation of a new underground conveyance system, to include removal or rerouting of the existing facilities, and all restoration of county right-of-way and adjacent private properties.

Kitsap Memorial State Park
Bremerton, WA
Provide and set two 3,000 gallon septic tanks, renovate a lift station, including the pumps and controls, underground electrical service and connection to the existing effluent tightline. Also included is the construction of the pressure distribution system comprised of the force main, pressure graveless drainfield lines, and miscellaneous other work.

Klahowya School Sewer, Force Main, Pump Station
Bremerton, WA
Approximately 6,000 lf of sewer line 8" - 12" manholes and other utilities.

Home | Contact Us
5107 State Hwy 3 SW, Port Orchard, WA 98367 | Phone: 360.674.2100 | Fax: 360.674.7190
© 2005-07 Stan Palmer Construction, Inc., an Equal Opportunity Employer. Use of this website signifies your agreement to the Terms and Conditions of Use.

  What We Do

“They maintained a professional approach and completed complicated tasks without complaining about inadequate information or direction and with few (and none unjustified) requests for change orders.“
H.R. Esvelt Engineering
H. Richard Esvelt, P.E.