Stan Palmer Construction: Roads and Bridges

What We Do

Roads and Bridges

NW Newberry Hill Road Widening and Resurfacing
Silverdale, WA
Reconstruction of 2.08 miles of county roadway widening including 20,000 cy of excavation, 10,000 lf of storm piping, 4500 lf of 16" waterline, rockwalls, subgrade gravels, asphalt paving, wetland mitigation, guardrails, traffic control, and related work over a fast track 100 working days.

Caldart Avenue Reconstruction
Poulsbo, WA
Reconstructed a major street in front of the City High School. Included asphalt grinding, deep 36" storm piping, a 96" diameter detention system, retaining walls, grading, walks, curbs and gutters, paving, and traffic control.

SR305 Hostmark St to Bond Rd - HOV Lanes
Poulsbo, WA
The work consisted of improvements traffic capacity of SR 305 in Kitsap County for 2.06 miles, MP 11.17 and MP 13.23, by adding HOV lanes. These improvements shall include clearing, grading, draining, surfacing, paving with hot mix asphalt, constructing cement concrete curb and gutter, sidewalks, and driveways, retaining walls, culvert replacements, three sided structure installations, stream channel excavation and planting, wetland site construction and planting, signal and illumination systems, pavement marking, roadside seeding and planting, permanent signing.

SR 304 Transportation Improvements; Gateway Phase
Bremerton, WA
Reconstruct the urban arterial in the City of Bremerton along a new alignment. This project consisted of removing existing streets, roads and alleys, and portions of the combined sewer; reconstructing side roads, curbs, gutters and sidewalks, storm drainage, traffic signals, illlumination, permanent signing, channelization, landscape site grading, landscape planting, landscape irrigation, fencing and traffic control during construction and other work.

Bremerton National Airport - Beacon Relocation, Wildlife Fencing, and Slurry Seal Improvement Project
Port Orchard, WA
Installed an airport beacon and beacon tower with related electrical systems, as well as wildlife fencing, and placing slurry seals on the terminal apron, parking apron, and hangar taxilanes.

Chico Creek Bridge Replacements
Bremerton, WA
Construct two 80' bulb & tee bridges over Chico Creek. Pile driving, excavation, concrete work, bridge construction and paving. Constructed stream bypass for construction of bridge abutments. Stream enhancements including rootwad structures.

SE Mile Hill Drive Roadway Improvements
Port Orchard, WA
The Contract provided for the improvement of 1.48 miles of SE Mile Hill Drive from Long Lake Road SE to Colchester Drive SE in Port Orchard vicinity of Kitsap County. Improvements include widening the road to two 12 foot lanes with 8 foot paved shoulders, a center turn lane, traffic signal systems at the Long Lake Road Se and California Avenue SE intersections and traffic signal modifications at the Woods Road SE intersection. The work proposed consists of two schedules, Schedules A consists of Preparation, Grading, Drainage, Strom Sewer, HMA, Erosion Control, Traffic Safety and Control, Traffic Signal Systems and related Work.

East L Street Bridge
Tacoma, WA
This contract generally consisted of removing the existing East L Street Bridge, constructing a new bridge, and reconstructing East L Street from East 26th St. to Puyallup Ave.

Home | Contact Us
5107 State Hwy 3 SW, Port Orchard, WA 98367 | Phone: 360.674.2100 | Fax: 360.674.7190
© 2005-07 Stan Palmer Construction, Inc., an Equal Opportunity Employer. Use of this website signifies your agreement to the Terms and Conditions of Use.

  What We Do

“I appreciate a contractor who takes pride in their work and sets a goal to complete the project to the best of their ability. They are hard to find in the present bidding environment.”
H.R. Esvelt Engineering
H. Richard Esvelt, P.E.