Kingston Waste Water Treatment Plant and Pump Station No. 71 Kingston, WA
Preconstruction planning, sitework, off site force mains and water line, 2650 cy structural concrete, three buildings, yard piping, mechanical piping, pumps and major equipment, miscellaneous metal, electrical, controls and start-up.
North Central Conveyance Pump Station No. 24 Bremerton, WA
Constructed the following: a pump station with separate dry well and wet well - the lower level of the dry well will house the vertical nonclog centrifugal pumps and each pump shall have a capacity of 3,800 gpm; variable speed pump controls; carbon adsorption odor control facilities; a 750 kw standby power generator with an acoustical enclosure and above ground fuel storage; screening walls to enclose the odor control facility, fuel storage tank, and standby power generator; connections from new Pump Station No. 24 to the existing force main; sanitary sewers together with manholes, surface improvements, removal and restoration connection to existing sewers; storm drains together with manholes, catch basins, detention pipes; electrical distribution and feed systems; instrumentation and control systems including software programming; site work including earthwork, yard drainage systems, paving sidewalk, curb and gutter, and landscaping; temporary pumping station for existing pump station No. 24; bypass piping around existing Pump Station No. 15; air valves on existing force main; and other associated facilities and improvements.
OF-2 to Manette Treatment Plant Conveyance Improvements Bremerton, WA
Installed approximately 790 linear feet of 36-inch, 530 linear feet of 42-inch, and 715 linear feet of 30-inch diameter reinforced concrete pipe, manholes, overflow weir assembly modifications, work site traffic control, surface restoration, erosion & sedimentation control, all connections to the new and pre-existing facilities, and appurtenances.
Aberdeen Water Treatment Plant & Facilities / City of Aberdeen Aberdeen, WA
Constructed a water treatment plant and all site work; piping and facilities associated with the plant; one mile long access road to the site; installed a water storage tank; and constructed and installed a valve/meter vault. Included installing a membrane filtration system procured by the Owner under a separate contract.
“Your attitude of fairness in creating and negotiating change orders was appreciated and kept our construction budget in control”
Port of Tacoma
Clay Waseen, Project Manager