Stan Palmer Construction has developed a unique approach to large-scale earthmoving. Haul routes and cycle times define the schedule, but timely implementation is a function of equipment power. Stan Palmer Construction’s fleet of scrapers, combined with excavators and articulated trucks, achieves more production per hour on mass grading projects. Experienced superintendents monitor and direct the assets as cuts and fills proceed, to quantify and report each day’s progress.
Speed is essential, but so is exactness. Soil must be aerated, restructured, and compacted to the right point on the density curve. Each of our operating engineers is a skilled professional. Some have been members of our field crews for more than 10 years. Owners and construction firms rely on our fleet of equipment and expert knowledge that Stan Palmer Construction brings to every project.
State Route 123 Phase 1 Mt Rainier National Park, WA
Major slope stabilization entailing the excavation up to 54' deep of the existing roadway and replacing it with 51,000 cubic meters of blasted, large buttress rock. Other work included bridge renovation, culverts, geogrid walls, road surface rehabilitation, shoulder widening, cold asphalt recycling, and a 2" hot asphalt overlay. Traffic control required the use of one lane at all times.
Kent East Hill Youth Sports Complex Kent, WA
Construction of a 10 acre multiuse youth ballfield complex consisting of: two multi purpose synthetic turf fields for Baseball / Soccer / Football / Track; restrooms; maintenance and storage building with two picnic tables (shelters); water & sewer main extensions; side sewer extensions; one storm water detention pond; concrete pathways throughout the complex; chain link fence; split rail fencing; netting; irrigation; field lighting; landscaping and approx. 270 parking stalls.
Staples & Walgreens, Site Work Package Port Orchard, WA
30,000 yards of site excavation, site grading, landscaping, utilities, storm, sewer, paving, concrete work, parking lot lighting, emergency generators and a sewage pump station.
Fred Meyer Retail Store Site Work Package / Port Orchard, WA Port Orchard, WA
A 25 acre commercial development including housing demolition, clearing, 250,000 cy excavation and export, all utilities including 4000 lf of street gravity sewer and force main, landscaping, concrete work, paving, parking lot illuminaires, sewage pump station with emergency generator, and 5 acres wetland construction.
Celebration Park Development Federal Way, WA
The project covered 45 acres and consisted of three major construction components: eight athletic fields, connecting two and three land streets including parking, and two buildings. Work included: clearing and grubbing; earthwork ( 250,000 cy ); storm water drainage; sanitary sewer; domestic water; primary and secondary power; four underdrained and irrigated softball fields, four underdrained and irrigated soccer fields, fencing, asphalt concrete pavements, concrete curb and gutter, street and parking lot illumination, traffic signal, asphalt and concrete sidewalks, wetland mitigation and planting, landscape planting, pedestrian trails and bridges, two masonry restroom/concession buildings (approx 1,465 sf each), building electrical/plumbing/heating and one prefabricated maintenance building (approx 1,260 sf.).
“Stan Palmer Construction has done an exceptional job on this project with difficult soils and complicated construction.”